You are reporting the following problem report for being abusive, containing personal information, or similar:
Long standing pore mantanance of dranige Reported anonymously at 16:17, Wed 25 November 2020 Entire lenth of this section the drainage gully have not been cleared for over 2 years which i suspect has resulted in the pipe to the ditch blocking and the dike as well. There has been some tree work caried out with overnight closures So why can the team not talk to each other and .work together to fix issues in one coordinated sweep rather than numours road closures costing thousand for 2 guys to sit in there truck with flashing lights on all night on each ocation The previouse section towards Lowerstoft is also the same
Entire lenth of this section the drainage gully have not been cleared for over 2 years which i suspect has resulted in the pipe to the ditch blocking and the dike as well. There has been some tree work caried out with overnight closures So why can the team not talk to each other and .work together to fix issues in one coordinated sweep rather than numours road closures costing thousand for 2 guys to sit in there truck with flashing lights on all night on each ocation The previouse section towards Lowerstoft is also the same
You can contact technical support on info@highwaysengland.co.uk