You are reporting the following problem report for being abusive, containing personal information, or similar:
Very large pot hole Reported anonymously at 12:57, Thu 1 April 2021 Pot hole north bound carrigeway of a1089 approximately 250m north of the asda roundabout. this pot hole is very large and has had numerous temporary repairs carried out over the last year. road used by very large lorries coming out of the tilbury docks 24/7. the lorries are generating a lot of noise and viberation due to the pot holes not being repaired prroperly. this is leading to sleepless nights and a lot of noise and viberation in my house which is quite close
Pot hole north bound carrigeway of a1089 approximately 250m north of the asda roundabout. this pot hole is very large and has had numerous temporary repairs carried out over the last year. road used by very large lorries coming out of the tilbury docks 24/7. the lorries are generating a lot of noise and viberation due to the pot holes not being repaired prroperly. this is leading to sleepless nights and a lot of noise and viberation in my house which is quite close
You can contact technical support on info@highwaysengland.co.uk