Many sections of the joint between first and second lanes for approx. 2 kilometres length. This is causing cars and motorcycles to veer off violently when they hit the pots. At speeds up to 70 mph etc, these are posing a very dangerous hazard with the compounded problem of potential damage to the vehicles that hit them. Broken suspension brings are in evidence and many must have suffered damage to their car motorcycle tyres. This needs an urgent repair (permanent not temporary.

Reported in the Potholes category anonymously at 11:09, Saturday 22 February 2020

Sent to Highways England 1 minute later

These holes are increasing in size as I observe them daily on my commute.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Still open, via questionnaire, 13:33, Saturday 21 March 2020

  • Still open, via questionnaire, 19:56, Saturday 18 April 2020

  • Despite almost no traffic, these poor road surfaces remain in a very poor state and still posing a massive threat of danger to road users. The opportunities are being lost as we come out of lockdown. These repairs could have been actioned along with many other road surface discrepancies over the past lockdown 8 weeks and at a vastly reduced cost due to having perfect weather for road reinstatement.

    Just what are the councils and highways England thinking??

    Posted anonymously at 20:28, Saturday 16 May 2020
    Still open, via questionnaire

  • Still open, via questionnaire, 22:23, Saturday 13 June 2020

  • Still open, via questionnaire, 22:36, Saturday 11 July 2020

  • Now that we are post lockdown, the traffic density is back to “normal” and the repairs have lasted 6 days and are showing massive degradation of the road surface. Yet another Clouncil who haven’t seen the plot that proves the temporary repairs done by crap contractors are just milking the system in conjunction with local decision makers. I wouldn’t pay them in tin washers.

    You pays your money eh???

    Maybe if we were to suggest that the Queen is visiting, something might get done. Haha

    Posted anonymously at 10:47, Sunday 9 August 2020

  • Now that we are post lockdown, the traffic density is back to “normal” and the repairs have lasted 6 days and are showing massive degradation of the road surface. Yet another Clouncil who haven’t seen the plot that proves the temporary repairs done by crap contractors are just milking the system in conjunction with local decision makers. I wouldn’t pay them in tin washers.

    You pays your money eh???

    Maybe if we were to suggest that the Queen is visiting, something might get done. Haha

    Posted anonymously at 14:19, Friday 14 August 2020
    Still open, via questionnaire

  • Still open, via questionnaire, 09:50, Monday 14 September 2020

  • Resurfaced carried out and with good quality levels and products. Many thanks guys.

    State changed to: Fixed

    Posted anonymously at 16:07, Monday 12 October 2020