Back to all reports

20 Metres of fencing down

Reported via desktop in the Structures (eg bridges, fencing, noise barriers) category anonymously at 11:46, Monday 4 January 2021

Sent to National Highways less than a minute later

This fencing has been down for 4 months and separates a footpath from the M3 embankment

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This Fence is located on the foot path to the foot bridge over the M3 at the end of Fintry Walk. It separates the footpath from the Motorway.

    Posted anonymously at 10:22, Monday 25 January 2021

  • Today is April 22nd 2021. The fencing is still down and this was reported January 4th 2021. 3 Months and this still has not been resolved? Why has this not been repaired?

    Posted anonymously at 14:34, Thursday 22 April 2021

Provide an update

Your information will only be used in line with our privacy policy

No personal details will be stored.

Your update