Back to all reports

Noise increase

Reported via mobile in the Structures (eg bridges, fencing, noise barriers) category anonymously at 23:48, Thursday 15 April 2021

Sent to Highways England less than a minute later

Ever since the motorway was expanded there has been a significant increase in noise. Only a small broken fence built in the 1970s remains. There needs to be a new large acoustic fence placed here similar to the one near junction 4.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for bringing the increased noise to our attention, following the Smart Motorway works.

    During the Smart Motorways works new noise fencing was replaced or installed as appropriate. Our database shows that all Noise Important Areas along this stretch of the M20 have already been mitigated with insulation and at this time there are no plans to install further fencing.

    We're planning resurfacing works to lanes 2 and 3 and anticipate carrying these works out in June 2021. Thin coat surfacing will be used and this should assist in reducing traffic noise.

    We will continue to review this and will arrange any required work if the situation changes.

    The current condition of the fence has been passed to our Inspector for review and suitable repair.

    If you require any further update on this issue our Customer Contact Centre is available 24 hours a day at: • 0300 123 5000

    • info@highwaysengland.co.uk

    Kind regards Highways England

    State changed to: No further action

    Posted by Highways England at 09:07, Tuesday 20 April 2021

This report is now closed to updates. You can make a new report in the same location.